The timeframe set by the client for the development of this project is unrealistic. However, the client does not need to know the actual time required to develop these proposals. Especially since the client responded that they consider these two days sufficient for development. The task of the participants is to provide the client with the most useful information under the conditions specified by the client. Given the extremely limited time available for project development and despite the fairly high cost determined by the client, at this stage, only a hastily developed option based on the client's wishes can be offered. The presented materials accurately reflect the real situation. Additionally, a file in .ifc format is attached, allowing further development in any available program (AutoCAD, Revit, SketchUp, etc.). I believe it would be beneficial to present a variety of options based on specific wishes, which can provide a basis for reflection and help in choosing a direction for further specific development, as opposed to one hastily developed option, which is therefore not of very high quality, presented instead.